PEPSI SUPER BOWL 48

Workspace11 worked closely with 3m/GTG and Auxoffice architects to engineer and fabricate a fifteen-foot interactive multi-media tower with moving LED screen and a thirty foot radius seating pavilion for the Pepsi halftime show during Super Bowl 48 at Met Life Stadium.
Workspace11 worked closely with 3m/GTG and Auxoffice architects to engineer and fabricate a fifteen-foot interactive multi-media tower with moving LED screen and a thirty foot radius seating pavilion for the Pepsi halftime show during Super Bowl 48 at Met Life Stadium.
Share by: